Contacts
Plant and office in Odesa. Call us or send your technical specification — we'll answer to the point, with a preliminary calculation within 24 business hours.
Address
Phone
Hours
Mon–Fri: 9:00–18:00
Sat–Sun: by appointment
Sat–Sun: by appointment
Company details
LLC "LK Energy Group"
EDRPOU 45323348
EDRPOU 45323348
About us in brief
Why clients choose LK Energy
- Our own switchgear equipment plant (0.4–35 kV) in Odesa — manufactured to your diagram.
- Full cycle under a single contract: design, manufacturing, installation, commissioning, service.
- Our own electrical testing laboratory, issuing test reports.
- We work across all of Ukraine: delivery, installation and on-site supervision of installation.
To get a calculation faster
Send us your single-line diagram or fill out the questionnaire sheet — this is the main thing an engineer needs to calculate a switchboard or substation. For a solar power plant, send the site address and your average monthly electricity bill — this is enough for a preliminary estimate. Preliminary reply — within 24 business hours.
Write to us
Describe your task or attach a technical specification — an engineer will answer to the point and send a calculation.
+380 67 104 94 91