Our own electrical equipment factory in Odesa · on the market since 2005

We design.
We manufacture.
We install.
We commission.

Our own factory producing 0.4–35 kV switchgear and substations, plus a full-cycle team: design, manufacturing and commissioning — the key stages are carried out in-house.

I am looking for:
since 2005own workshop since 20150.4–35 kV1000+ facilities
A row of 10 kV KSO switchgear cabinets manufactured by LK Energy
Switchboard assembly at our own workshop
KSO / KRU 6–35 kVin-house manufacturing
3 000+
units produced
Get a calculation →
Turnkey solar power plant — an LK Energy facility

From project to launch — one team

We carry out design, switchgear manufacturing and installation in-house — a single company is accountable for the result, with no gaps between stages.
21+ years
on the market, since 2005
3000+ units
of manufactured products
1000+
facilities built
0.4–35 kV
voltage classes
Our own factory · since 2015

Our own workshop in Odesa —
a full assembly cycle.

A full-cycle factory: metal structures, busbar work, installation of devices and secondary circuits, in-house quality control. Our own design bureau and electrical testing laboratory.

  • Batch and custom manufacturing
  • In-house test benches
  • Incoming inspection of components
  • Factory testing of every product
Learn more
Assembly of KSO cabinets at the LK Energy workshop
LK Energy metal structures workshop — a CNC punch press
In-house manufactured switchboard
4.95 MW turnkey solar power plant, Odesa region
Turnkey EPC

4.95 MW turnkey solar power plant

4.95 MW capacityOdesa regionEPC full cycle
For investors · "turnkey" track

Solar plant payback calculation

Based on your facility's data, we will calculate the plant's capacity, savings and payback period — included in the commercial proposal.

Request a payback calculation →Free · calculation included in the proposal

This is an indicative calculation based on typical parameters, not a guarantee. Actual payback depends on the DAM price, connection cost and consumption profile, and is fixed in the project and the contract.

Quality and warranties

Quality control at every stage

Compliance with DSTU / IEC

Equipment complies with current DSTU / IEC standards; test protocols are provided on request.

Our own design bureau + laboratory

An in-house design bureau and electrical testing laboratory.

Factory testing

Inspection and testing per DSTU / IEC before shipment.

Warranty and service

Warranty and post-warranty service.

Free guide · PDF

Choosing a solar contractor: where budgets get cut and how to spot it before you sign

  • an 11-point checklist of where costs get trimmed in a solar plant project;
  • two illustrative examples from service practice — in plain language;
  • what to check in a contractor’s proposal before the contract.

Author — Viacheslav Yurdyk, quality engineer at LK Energy Group. 8 pages.

Get the guide

Describe your task —
we'll give you a solution and a price

If you have a single-line diagram, terms of reference or a specification, attach it. If not, just describe the task in words and we'll suggest a solution. A preliminary calculation is usually ready within 24 business hours; detailed design solutions are quoted with a separate timeline.

Preliminary proposal usually within 24 business hours · detailed design solutions on a separate timeline
+380 67 104 94 91
Submit a request

Send your single-line diagram or specification to info@lk-energy.com.ua — or we will contact you and ask.