Home/Projects/400 A ATS panel: automatic mains-to-generator transfer for an industrial site

400 A ATS panel: automatic mains-to-generator transfer for an industrial site

The АВР-200-400 panel with two motorised 400 A incomers (switchboard + diesel generator), phase monitoring and interlocking, plus an IP54 metering panel. Built in Odesa, 2026.

400 A ATS panel: automatic mains-to-generator transfer for an industrial site

A 400 A automatic transfer switch panel with two motorised incomers: main supply from the low-voltage switchboard and standby from a diesel generator. Transfer is automatic, with per-phase voltage quality monitoring. The delivery also includes a separate IP54 metering panel. A 2026 order, built at our own plant in Odesa.

The task

The site has a diesel generator as its standby source. The point was never simply to have the generator — it was to make the load move onto it without a human in the loop, and back again once the mains recovers.

The requirements that shaped the design:

  • Two independent 400 A incomers — from the switchboard and from the generator, with mechanical and electrical interlocking: the two sources must never meet.
  • Automation, not a manual changeover switch — transfer without an operator, triggered by loss of mains or by its parameters drifting out of tolerance.
  • Monitoring supply quality, not just its presence — phase imbalance and a broken neutral must be detected the same way as a complete outage.
  • Metering kept separate — the metering section sits in its own IP54 enclosure, suitable for a dusty room.

The solution

We built two panels that work as a pair.

1. The АВР-200-400 panel — the heart of the scheme:

  • Two 400 A moulded-case circuit breakers with a 36 kA breaking capacity and adjustable trip units.
  • Two motor operators on those breakers — this is what makes the transfer automatic: the breaker opens and closes on a command from the logic, not by hand.
  • Two three-phase voltage and phase-monitoring relays — watching each incomer: voltage, imbalance, phase sequence and phase loss.
  • Interposing relays for the transfer logic and signalling.
  • Busbars with phase colour marking and a separate PEN bar.
  • Source indication on the door: two lamps labelled "Від шафи ГРЩ" (from the switchboard) and "Від шафи АВ ДГУ" (from the generator ATS). The operator sees which source is feeding the site without opening the panel.

2. The ПР11-3045 IP54 panel — a 400 A metering section with a circuit breaker in a dust- and moisture-protected enclosure.

Both panels carry a factory nameplate and a QR code: ratings and serial number can be read on site. The series product card: ATS panel. For designers: the typical solutions "0.4 kV ATS" and "0.4 kV ATS with two incomers".

Figures (from the passports)

АВР-200-400 panel, serial No. 174139

Rated voltage / frequency380 V / 50 Hz
Rated main-circuit current400 A
Control circuit voltage~220 V
Ingress protectionIP31
Dimensions (H×W×D)1600 × 800 × 400 mm + 100 × 800 × 400 plinth
Weightmax 150 kg
Climatic designУ3 (GOST 15150-69)
Temperature range−40 to +40 °C
Built toGOST 22789-94

ATS bill of supply (from the passport)

400 A moulded-case circuit breaker, 3P, 36 kA breaking capacity2
Motor operator for the circuit breaker (AC230 / DC110-220 V)2
Three-phase voltage and phase-monitoring relay2
Interposing relay 230 V AC, 4CO5

ПР11-3045-IP54-У1 metering panel, serial No. 174140

Rated voltage / frequency380 V / 50 Hz
Rated main-circuit current400 A
Ingress protectionIP54
Dimensions (H×W×D)800 × 800 × 400 mm
Weightmax 50 kg
Contents400 A circuit breaker, 3P

What this delivers on site

  • Transfer to the generator with no operator — the logic detects loss or degradation of the mains and starts the transfer itself.
  • Protection against a bad supply, not only a missing one — the phase-monitoring relay catches imbalance and phase loss, which are often more damaging to equipment than a clean outage.
  • The two sources can never meet — the incomers are interlocked.
  • Status readable from the corridor — labelled lamps on the door instead of guesswork.

Photo report: from frame to the finished panel

Assembly of a 400 A ATS panel: two incomers with motor operators 400 A ATS panel with motor operators and secondary circuits Busbars and switchgear of the 400 A ATS panel Main and secondary circuit assembly of the ATS panel Brush cable entry on the ATS panel roof Indicator devices mounted on the ATS panel door ПР11 IP54 metering panel with a 400 A circuit breaker ПР11-3045 metering panel, IP54 design Finished 400 A ATS panel with source indication Factory nameplate and QR code of the ATS panel

We'll build an ATS panel to your diagram

Send us the single-line diagram and the type of your standby source — we'll size the panel to your current, with motor operators, phase monitoring and metering. From the diagram to factory testing and a passport.

В
В'ячеслав Юрдик
Quality Engineer
Over 1,000 units of equipment accepted at the factory (QC) and 200 electrical installation sites under technical supervision.

Need a similar project?
We’ll estimate yours

Send us your specification or describe the task — we will propose a solution and estimate the time and cost. Preliminary reply within 24 hours.

+380 67 104 94 91
Discuss the project