Turnkey Solar Power Plants
Construction of solar power plants: rooftop 5–30 kW, commercial and industrial up to 5 MW, hybrid with storage. Design, installation, grid connection, service — free calculation.
Turnkey Solar Power Plant: What We Take On
A turnkey solar power plant from LK Energy means a single contractor for the entire cycle: site survey, design, equipment, installation, grid connection and service. We are a manufacturer of electrical switchgear with our own factory in Odesa and an EPC contractor: about 100 solar power plants built to date, with our flagship being an industrial 4.95 MW plant with energy storage.
Which Plants We Build
- Rooftop and residential, 5–30 kW
- for a house or small business; roof- or ground-mounted. Details on the rooftop and residential solar power plants page.
- Commercial, 30–100 kW
- shops, auto service centers, warehouses, small manufacturing facilities — covering part of daytime consumption with own generation.
- Industrial, 100 kW – 5 MW
- factories, agricultural enterprises, greenhouses. Details on the solar power plants for businesses page; the plant as an investment asset — on the investing in industrial solar power plants page.
- Hybrid with storage (BESS)
- a plant with a battery: power during outages, peak load shaving, operation during hours of expensive electricity. Important: a grid-tied plant without a battery does not operate when the grid is down — this is a safety requirement.
How We Work: 6 Steps
- Survey and calculation. We analyze consumption, the roof or site, and the connection point. A preliminary calculation usually takes 24 working hours.
- Design. Plant layout, equipment selection, documentation; for large facilities — state expert review.
- Procurement. Modules and inverters from proven manufacturers; switchgear, KTP (package transformer substations) and distribution devices — of our own manufacture, with factory testing.
- Installation. Structures, modules, inverters, electrical works — our own crews with 0.4–35 kV certifications.
- Connection and documentation. Technical specifications, approval with the regional power distribution company (oblenergo), agreement with the electricity supplier.
- Commissioning and service. Testing, monitoring setup, staff training; followed by service maintenance.
Approximate timelines: a rooftop plant for a house — from two to three weeks; an industrial facility — from two to six months, with grid connection usually being the longest stage.
Get a calculation for your facility →
How Much It Costs
The price depends on capacity, equipment, the type of roof or site, and the connection point, so the only honest answer is a calculation for your specific facility. For a preliminary estimate, your average electricity bill and address are enough. The calculation is free. The commercial proposal includes a list of equipment, price, timelines and expected generation by month. Prices are quoted including VAT.
Completed Projects

Our flagship facility is an industrial 4.95 MW solar power plant with a 20 MWh storage system in Odesa region: 10,200 modules, 45 working plus 2 backup inverters, containerized BESS units and substations of our own manufacture. In total we have built about 100 plants of various scales — more projects are available in the "Project Examples" section.
Why LK Energy
- Our own equipment factory
- we manufacture switchgear, KTP (package transformer substations) and distribution devices ourselves in Odesa — in this respect we do not depend on external suppliers, and we control quality, price and timelines.
- Full cycle under one roof
- design, manufacturing, installation, connection and service — one company and one zone of responsibility.
- Certifications and testing
- work at 0.4–35 kV, our own electrical testing laboratory, factory equipment testing with protocols.
- Financial model for large projects
- for investors we calculate the plant's economics based on a real market profile; payment options are on the financing page.
What the work includes
- We independently supply solar panels and manufacture electrical equipment for solar power plants
- A full range of works: from feasibility analysis to project implementation
- Support with permitting and approval procedures for connecting the solar power plant to the grid (net metering)
- Prompt operational and maintenance service
FAQ
What are the main benefits of building a solar power plant for own consumption?
How do you choose the right capacity for a solar power plant?
How long does the process of building a turnkey solar power plant take?
Why should a solar power plant be built with a contractor that has its own production and 0.4–35 kV certifications?
What are the stages of building a solar power plant?
The full cycle runs from pre-design work and grid connection terms through installation, commissioning and handover into operation. The list of stages is given in the section above, and a detailed breakdown with timelines is in the article "Building a solar plant: stages and timelines" (in Ukrainian). The substations and switchgear for the plant are made in-house.
Do you build solar power plants in Kyiv and other regions of Ukraine?
Yes, we build across Ukraine: an engineer visits the site, installation is carried out by our own crews, and testing by our own electrical laboratory. Substations and switchgear for the plant are made at our factory in Odesa and delivered to the site. Completed projects are in the projects section.
Let’s discuss your project:
Turnkey Solar Power Plants
Send us your specification or describe the task — we will estimate scope, time and cost. Preliminary reply within 24 business hours.
+380 67 104 94 91