Photos: switchboard equipment production and assembly
Manufacturing of switchgear equipment: panel assembly, KSO/KRU (switchgear cabinets), LV switchgear (low-voltage switchgear assemblies) in our workshop
A photo selection from our plant in Odesa: assembly of ShchO-90 panels, KSO cubicles, RUNN and VRP cabinets — from the metal frame to acceptance testing. See how these products perform on site in our case studies:
- ShchO-90 rated 2000 A: main distribution board with withdrawable air circuit breakers
- Ten VRP panels in a single package: from 100 to 1600 A
- Package for an indoor transformer substation: 10 kV switchgear on KSO-E cubicles and a 0.4 kV board of ShchO-90 panels
- KRU-E 6 kV in the KM-1F footprint: 16 cubicles replacing an obsolete series
See also
- KSO-E Type Single-Front-Access Switchgear Cabinets, Assembled (Dimension 393)
- Complete Switchgear Assembly (KRU-E-2-10, 10 kV)
- RUNN LV Switchgear Cabinets
- Case: КРП-4000/0.4 У1
- Case: 6 kV КРУ-Е switchgear in the КМ-1Ф frame size: 16 cubicles replacing an obsolete series
- Case: I-710 street lighting control cabinets
- Manufacturing of Electrical Switchgear Equipment
Site photos






Need a similar project?
We’ll estimate yours
Send us your specification or describe the task — we will propose a solution and estimate the time and cost. Preliminary reply within 24 hours.